M‑Tech Power
Power backup & solar systems

Tell us what you need to power. We design the system around it.

We design, supply, install, commission and support power backup and solar systems for homes, businesses, institutions and industrial sites.

Every system starts from a load assessment of what you actually run — not a package picked off a shelf and hoped to fit.

Load assessment and system proposal before you commit to anything.
Technician on site
Design first
Load assessment before anything is quoted
Sized on what you actually run
End to end
Design, supply, install, commission, support
One team throughout
Gov & corporate
Delivered for public and private sites
Malawi and Mozambique
On site
Readings at a main board
Mounting solar panels
Handover
Our team on site.
Sound familiar?

Most disappointing installations were wrong before anyone switched them on

A backup or solar system either carries your real load for the time you need it, or it doesn't. That is decided at design, not at installation.

The system was sized by guesswork
A package is chosen from a price list, not from your load. It runs the lights and fails the moment the real equipment comes on.
Supply‑only, support never
Equipment is delivered, someone else installs it, and when it underperforms nobody owns the problem.
Nobody explained the trade‑offs
You're sold panels when you needed runtime, or batteries when you needed generation, because the conversation started with a product.
↓ How we avoid all three ↓
We start with your load
What you want to power, and for how long. Everything in the design follows from those two answers.
We commission what we install
Design, supply, installation, commissioning and after‑sales sit with one team — ours.
You see the design before you pay
We propose the system and discuss it with you. The quote comes with the design, not instead of it.
How a project runs

Five steps. You approve before anything is ordered.

Step 1
You tell us what to power
Step 2
System and load assessment
Step 3
We propose the system
Step 4
You approve and pay
Step 5
Supply, install, commission
What happens at each step →
Sites we have delivered
Road Traffic Directorate
Government
Auction Holdings Limited
Corporate, multi‑site
FDH Bank
Banking
Casino Marina
Hospitality
KCH
Health
See the track record →

Start with the list of what you need to keep running

Send us the equipment and how long you need it to run without mains power. We do the load assessment, design the system and come back to you with a proposal and a quote.